MAutomotive Portugal Conheça-nos um pouco melhor: Plant with covered surface of 4.400 square meters, it was completed on December 2014, the production started on May 2015. Site Certified according to the Norm ISO 9001 since January 2016 and to the standard ISO TS 16949 since September 2016. As the other facilities of the Modulo Group, MAutomotive has mechanic and hydraulic presses with power from 150 Tons to 500 Tons, machines for projection welding and tumbling. The 3D-machine Faro-Arm is part of the equipment of the metrologic room. Partilhar esta informação